May 13, 2025 Breaking News, Latest News, and Videos

Palisades Bluffs Project Is Complete:

The Palisades Bluffs Stabilization Project was completed sooner and cost less than expected, something not often reported for the City’s capital improvement project.

City Engineer Lee Swain said the project was completed in April 2010, “two months early than contracted for.” The earlier completion date was made possible becausepartnering with the City of Santa Monica Caltrans allowed the City’s contractor to expand daily working hours for the project. Therefore, more work was accomplished each day.

The project’s cost of $1,775,200 was also significantly less than the engineer’s estimate of $3,500,000 to $4,000,000. Swain believes the city was able to get a lower bid on the project because the economy was were worse in 2009 than when the engineer’s estimate was made. The other reason Swain believes the cost was lowered was the city hired a specialist, Jensen Drilling Company, to do the work. Whenever a specialist is hired there is usually less overhead than when a general contractor is hired.

Another cost for the project was its construction management which was done by Vanir Construction Management for $389,330.

The Sept. 8, 2009 city staff report prepared for the City Council states that the project’s goal was to “remove groundwater that accumulates behind the bluff face to minimize future landslides” by installing horizontal drains. A total of eighty-two horizontal drains were installed at five different locations north of the California Incline. Approximately 18 drains were placed at each location and the drilling depths varied from 100 feet to 300 feet from the base of the bluffs.

Federal funds funded 80 percent of the project and the other 20 percent came from the city’s Redevelopment Agency funds.

Now that the bluffs project is complete the Environmental Impact Report (EIR) can be finalized for the California Incline Replacement Project. Caltrans wanted an assessment of the Palisades Bluffs to be part of the Incline’s EIR since they are located just above the California Incline.

Before the project can proceed both Caltrans and the City Council must approve the EIR.

Once the EIR is approved the final design for the new California Incline can be completed and construction can begin. Swain hopes is hopeful construction can start sometime in 2012 and be completed with the “least overall inconvenience” to the surrounding community.

in News
<>Related Posts

Golf Tournament to Raise Funds for Palisades Charter High School Wildfire Recovery

May 12, 2025

May 12, 2025

The “Raise Pali Golf Tournament” includes a nine-hole game, prize putting contests, and a community reception A community-led golf tournament...

Registration Opens for Second Annual Venice Beach Run

May 12, 2025

May 12, 2025

Race organizers promise a festive finish line atmosphere, complete with live DJs, a beer garden, a vendor expo, and giveaways...

Brentwood Art Center: Creative Art Camps for Kids and Teens this Summer

May 12, 2025

May 12, 2025

The beloved Brentwood Art Center is hosting summer camps at its new location at Olympic & 17th in Santa Monica. ...

Loyola High School, Community Honors Braun Levi, 18, After Tragedy in Manhattan Beach

May 12, 2025

May 12, 2025

Scholarship Fund Launched; Suspect with Suspended License Held Without Bail Tributes poured in over the weekend for Loyola High School...

City to Issue Solicitations for Affordable Housing Development at Bergamot Station Arts Center

May 12, 2025

May 12, 2025

Proposals for the Bergamot Station Arts Center must prioritize maximizing affordable housing units while also considering potential artist housing and...

Historic Lloyd Wright-Designed Palisades Home Hits Market at $12.9M

May 12, 2025

May 12, 2025

Wright, the son of Frank Lloyd Wright, designed the estate for an Academy-winning composer A historic estate designed by architect...

Saint Monica Prep: Mariner Sports Camps Focus on Fundamentals

May 11, 2025

May 11, 2025

Coaches that led Saint Monica Preparatory’s Mariner sports teams to win league and division titles are offering opportunities for the...

Top Malibu Sale of 2025: Oceanfront Malibu Colony Home Sells for $26.8M

May 11, 2025

May 11, 2025

Old Hollywood-Era Home Sells After Over a Year on the Market Topping Malibu’s residential sales charts for the year, a...

SM.a.r.t Column: Open Container, Closed Minds: Why Santa Monica’s Outdoor Drinking Plan Will Likely Drown

May 11, 2025

May 11, 2025

Santa Monica’s new plan to allow outdoor drinking on the Third Street Promenade between 8:00 AM and 2:00 AM is...

Annual Film Awards Show Leaving Santa Monica for Hollywood

May 11, 2025

May 11, 2025

The move marks a major shift for the iconic awards show, long known for its laid-back, seaside atmosphere that distinguished...

Group Exhibition “Boulders” Showcases Work by 34 Artists at Arcane Space

May 9, 2025

May 9, 2025

The exhibition emphasizes “mutual support, collective strength, and an unflinching engagement with this current moment.” A new group exhibition opening...

Avril Lavigne Partners with Palisades Skate Shop for Sweatshirt Fundraiser

May 9, 2025

May 9, 2025

The sweatshirt, blending Lavigne’s signature style with Paliskates’ skate culture roots, is on sale Three months after its spotlight moment...

Sunshine Beach Volleyball Camps: Register Open for Summer Camps

May 8, 2025

May 8, 2025

Summer is coming. For young volleyball athletes, that means registration for the Sunshine Westside Beach Camp and South Bay Beach...

World-Class Brew: Santa Monica’s Own Takes Home Top Beer Honors

May 8, 2025

May 8, 2025

Basil, Citrus, and Craftsmanship: See Which Local Brewery Just Won Big Santa Monica Brew Works (SMBW) just took home a...

Film Review: Thunderbolts*

May 8, 2025

May 8, 2025

FILM REVIEWTHUNDERBOLTS*Rated PG-13126 MinutesReleased May 2nd The Thunderbolts are a highly unique part of the Marvel Comics universe of superheroes...