July 6, 2025 Breaking News, Latest News, and Videos

Santa Monica Planning Commission Inquires About Esplanade Traffic:

The Colorado Esplanade is slowly straying away from being an ambitious plan to beautify Santa Monica, becoming instead a genuine talking point as the Planning Commission continues discussion about the project’s future and how it fits within the context of the city’s redevelopment.

While the Colorado Esplanade project still in design phase, commissioners seem more concerned with a practical matter: traffic.

To be located at the convergence of the Santa Monica Pier, Third Street Promenade, Civic Center Plaza, and a pair of planned projects in the Exposition Light Rail Line terminus and the Palisades Garden Walk, the pedestrian-themed project is expected to draw thousands of daily visitors to the downtown area.

While the designer, Peter Walker and Partners, presented a variety of ambitious design concepts, executed in several iconic cities in a manner the company hopes to realize in Santa Monica, commissioners spent more time inquiring about ways to deal with the prospect of increased traffic in the area immediately surrounding the Esplanade.

Even though the city has developed the Land Use and Circulation Element (LUCE) to help deal with traffic flow issues, the addition, by 2015, of as many as 400 travelers arriving on foot at the Esplanade every few minutes, courtesy of the Expo Line, will not make life any easier for buses and auto drivers traversing the intersection of Colorado Avenue and Fourth Street.

The designers of Peter Walker and Partners did attempt to address the potential reconfiguration of traffic lanes near Colorado Avenue and Fourth Street. One plan called for three total street lanes and a widened sidewalk. Another plan with a “justified” design allows for more vehicles to travel westbound on Colorado Avenue along a widened northern half of the road.

As the plans tended to favor westbound traffic along Colorado Avenue, Commissioner Hank Koning pointed out eastbound traffic has to go somewhere, so why discount one lane in that direction? After all, many who would head west into Santa Monica will probably drive east out of town.

Another explored possibility was to direct traffic through the Esplanade one-way.

Though traffic circulation was a talking point, commissioners and the designer also discussed the actual design.

Among the key design elements discussed were having the Santa Monica Pier serve as a defining visible marker for Esplanade visitors, trees, potential ground floor retail, public art, and increased landscaping.

According to city officials, a portion of the project construction is funded by a Metro grant.

In terms of scheduling, construction is expected to begin by mid-2012 and completed in 2013, about two years prior to the arrival of the Expo Line.

Keep up-to-date With The Mirror:

Follow The Mirror on Twitter: twitter.com/SMMirror

Follow The Mirror on Facebook: facebook.com/SMMirror

in News
<>Related Posts

Hama Sushi Hosts Weekly Music and Comedy Open Mics

July 5, 2025

July 5, 2025

The venue, a Venice Beach staple since 1979, has recently expanded its legendary happy hour to the entire patio Hama...

Connections Breakfast to Network Local Business Professionals in Malibu

July 5, 2025

July 5, 2025

The event, sponsored by Malibu Country Mart, will feature a breakfast mixer where attendees can meet new contacts  A Connections...

12th Annual Gopher Scramble Golf Tournament to Benefit Venice Heritage Museum

July 5, 2025

July 5, 2025

The museum opened to the public in March 2024 at the Main Street Design Center with its inaugural exhibition, “This...

Michael Madsen, Star of Reservoir Dogs and Kill Bill, Dies at 67 in Malibu

July 4, 2025

July 4, 2025

Actor Remembered for His Intense Performances and as a Poet  Actor Michael Madsen, known for his distinctive gravelly voice and...

Ruskin Group Theatre to Stage ‘The Fantasticks’

July 4, 2025

July 4, 2025

A timeless tale of young love and life’s bittersweet beauty, the show is reimagined with modern flair for contemporary audiences...

Film Review: F1: The Movie

July 4, 2025

July 4, 2025

FILM REVIEWF1: THE MOVIERated PG-13155 MinutesReleased June 27th F1: The Movie will envelop you in a racecar. You will be...

Big Blue Bus Launches Prohibition Order Program to Bolster Safety

July 4, 2025

July 4, 2025

The orders, which can range from 30 days to one year, target offenses that threaten the safety and comfort of...

Col. Eric Swenson Honored by LA for Historic Debris Removal Effort

July 3, 2025

July 3, 2025

Swenson, with a distinguished military background including a Ph.D. and multiple master’s degrees from Penn State and other institutions, has...

(Video) A visit to New York Bagel & Deli in Santa Monica

July 3, 2025

July 3, 2025

Authentic NY Style Bagels with Extra Creamy Cream Cheese and Multi-Cultural Desserts. Located at 2216 Wilshire Blvd. A visit to...

(Video) Legacy, Reimagined: Architecture, Design & Construction by Home Front Build Los Angeles

July 2, 2025

July 2, 2025

Go To Homefrontbuild.com For More Information @home_front_build Legacy, Reimagined: Architecture, Design & Construction by Home Front Build Los Angeles. Go...

(Video) Gladstone’s Malibu Prepares for Reopening after Surviving Palisades Fires

July 2, 2025

July 2, 2025

With One Half of its Structure Slightly Charred and Undergoing Repairs, Gladstone’s Malibu is Reopening its Patio Space Just in...

Santa Monica Public Library Launches Community Mapping Survey

July 2, 2025

July 2, 2025

The initiative aims to shape the library’s programs and services to better meet community needs, fostering an inclusive and accessible...

Third Street Promenade Loses Bibibop Asian Grill

July 2, 2025

July 2, 2025

Bibibop opened at the Santa Monica location in 2017 after taking over a former ShopHouse space Bibibop Asian Grill, a...

Proposed Rebuilding Authority for Wildfire Recovery Sparks Local Control Debate

July 2, 2025

July 2, 2025

Plan Aims to Streamline Rebuilding but Raises Questions Over Community Input A proposed “Resilient Rebuilding Authority” to oversee recovery from...

Pentagon Orders Troop Drawdown in LA: 150 National Guard Members Reassigned to Wildfire Duty

July 2, 2025

July 2, 2025

Federal Forces Begin Partial Withdrawal From Protest Response as California Leaders Push Back U.S. Northern Command announced Tuesday that 150 National Guard...