August 31, 2025 Breaking News, Latest News, and Videos

Access A Key Issue For Santa Monica Pier Bridge Replacement:

If you stroll enough from the corner of Ocean Avenue and Colorado to Pacific Park or one of the restaurants on the Santa Monica Pier, you are likely to develop a pair of very strong calves. However, the walk from the street down to pier may no longer be as steep as the City Council begins providing input on the Pier Bridge Replacement Project.

Still early in the process, a discussion of how the new Pier Bridge should look like unfolded at the Nov. 26 council meeting. According to City staff, the bridge connecting Ocean Avenue to the Pier – which was built in 1939 – was determined by the Los Angeles County Public Works Department to be “structurally deficient and functionally obsolete.”

A key issue for the new Pier Bridge: accessibility.

The council hoped the new design would make it easier for people with disabilities to access the pier from Ocean Avenue.

On a similar note, council member Bob Holbrook suggested having elevators transport people from street level to sea level similar to what exists at Salvador, Brazil.

According to City staff, the current Pier Bridge is at a 10 percent grade and slows pedestrian speeds.

“The steep slope can be especially difficult to traverse for families, those with limited mobility, elderly, and disabled patrons,” City staff stated. “A key objective is to make the Pier bridge fully ADA [American Disabilities Association] compliant from the Ocean and Colorado intersection – main route – while maintaining full federal funding participation.”

In all, four plans were presented to the council last week, each one potentially ADA compliant but with different means proposed to access the Pier from Ocean and Colorado.

One plan calls for a Pier Bridge that is 58 feet – or 70 percent – wider than the current connector. This plan was suggested for further study and environmental review.

A second plan would replace the current Pier Bridge with a new one of equal dimensions but add an ADA compliant path just north of the bridge. The separate bridge would, according to City staff, have to be 60 percent longer than the Pier Bridge. Thus, the pedestrian bridge would possibly spill into the 1550 parking lot. City staff did not recommend this plan.

Plan No. 3 proposes a vehicular bridge at Moss Avenue just south of the pier. A bicycle and pedestrian bridge would replace the current Pier Bridge. However, this plan would negatively impact delivery and emergency service from Ocean Avenue to the pier and was not recommended by City staff.

The fourth plan would replace the Pier Bridge with “a bridge of the current width designed primarily for pedestrian and bicycle use, as well as limited/controlled use for delivery and emergency vehicles.”

Vehicular access in Plan No. 4 would be provided via an access bridge at Moss Avenue. City staff had recommended the fourth plan for further study. 

According to City staff, Santa Monica is eligible to receive federal funding from the Highway Bridge Program to direct at least some funds to the proposed bridge replacement project.

Looking ahead, concept designs for the proposed Pier Bridge replacement will undergo an environmental analysis and review.

in News
<>Related Posts

SMMUSD Board of Education Changes Start Time for September 4 Meeting

August 30, 2025

August 30, 2025

Residents Can Tune In via Livestream or Make Public Comments Remotely The Santa Monica-Malibu Unified School District announced a revised...

Pacific Park Ferris Wheel to Glow with 90-Foot American Flag for Labor Day

August 30, 2025

August 30, 2025

The tribute will feature the Ferris wheel’s 174,000 LED lights in a custom computer-generated show of red, white, and blue...

State Launches Task Force to Tackle Homeless Encampments

August 30, 2025

August 30, 2025

The task force, comprising multiple state agencies, will target encampments along state rights-of-way in California’s 10 largest cities Gov. Gavin...

Santa Monica Flea-Borne Typhus Cluster Under Investigation as L.A. Cases Rise

August 29, 2025

August 29, 2025

County Confirms 106 Cases So Far in 2025 After a Record 187 Last Year Health officials are warning Los Angeles...

CHP Launches Annual Statewide Labor Day Crackdown on Impaired Driving

August 29, 2025

August 29, 2025

All Available Officers Will Patrol California Roads August 29–September 1 The California Highway Patrol will deploy every available officer this...

Santa Monica Historic District Tour Showcases Early 20th Century Bungalows

August 29, 2025

August 29, 2025

The Third Street Walk, led by Conservancy board president Mario Fonda-Bonardi, will highlight the architectural and historical significance of the...

Newsom Signs Order to Protect Clean Energy Projects Amid Federal Rollbacks

August 29, 2025

August 29, 2025

The order aims to secure federal tax credits for clean energy projects before they expire due to HR 1, dubbed...

Muscle Beach Championship Returns to Venice on Labor Day

August 29, 2025

August 29, 2025

The event will feature competitions across categories including bodybuilding, bikini, men’s physique, classic physique, angel bikini, and couples The iconic...

Film Review: Relay

August 28, 2025

August 28, 2025

FILM REVIEWRELAYRated R112 MinutesReleased August 22nd This movie plays like a chess game, mentally and physically – on foot and...

Santa Monica’s E-Bike Voucher Program Marks One-Year Milestone

August 28, 2025

August 28, 2025

A city blog post highlighted personal impacts, with one family avoiding a second car purchase for a commute to Burbank,...

Westside Classics Car Show Set to Roll into Venice Beach

August 28, 2025

August 28, 2025

The show will feature a curated lineup of vintage sedans, low-slung cruisers, and unique custom builds The Westside Classics Car...

Westside Chefs Shine at the Manhattan Beach Food & Wine Festival in September

August 28, 2025

August 28, 2025

South Bay’s Culinary Festival Returns With Two Nights of Food, Wine, and Music Santa Monica, Westchester, Los Angeles, and West...

(Video) Public Transit Returns to Pacific Palisades

August 27, 2025

August 27, 2025

The Return is Part of a Broader Summer Overhaul, Aiming to Boost Connectivity Across the Westside Public Transit Returns to...

Raising Cane’s Plans New Location on 3rd Street Promenade

August 27, 2025

August 27, 2025

The move marks the chain’s latest expansion in California Louisiana-based fast-food chain Raising Cane’s confirmed to the Santa Monica Mirror...