December 22, 2025
Breaking News, Latest News, and Videos

Traffic Advisory:

Caltrans will be installing adaptive signal controls along PCH from the McClure Tunnel to Topanga Canyon Boulevard. Once installed, these controls should help with traffic flow. Currently, the construction is between the Tunnel and Temescal Canyon Road.

Construction is slated to occur every night except Saturday, from 9 p.m. to 5 a.m., until October. At times, one lane in each direction will be closed. Expect delays.

For additional information, contact Marcia Graves at 213.897.7602 or marcia graves@dot.ca.gov or the Public Affairs office at 213.897.3656.

Previous Article

Hedge Ordinance Extended:

Next Article

At The Movies: Because He Could Not Stop for Death

You might be interested in …

AI in the Year 2020… Almost

By Nektar Baziotis In 1966 Gene Rodenberry’s “Star Trek” made its television debut on NBC. Audiences young and old were captivated by the show, particularly by its imagination of the space, the future, and the incredible […]

Red Nose Day Rally Raises the Roof

Students at Grant Elementary get into Red Nose regalia. Santa Monica’s Grant Elementary School rolled out the red carpet for Red Nose Day Wednesday, kicking off the school’s third year of fundraising with a high-energy […]