December 13, 2025
Breaking News, Latest News, and Videos

Santa Monica Pier Bridge Update: Existing Sidewalk Removal Begins Today:

The Santa Monica Pier's bridge interim pedestrian access improvements begin today

Eleven days of work begins today to remove existing sidewalks on the Santa Monica Pier Bridge to create a wider, single pedestrian walkway on the north side of the bridge.

A concrete barrier will be installed between the vehicle lanes and pedestrian walkway until the expected completion date of March 22, 2013.

The enhanced width sidewalk on the north side of the bridge is intended to better accommodate the volume of pedestrians traveling to and from the pier.  

Enhanced signage and roadway markings will be also be added.

For more information on the project, call 310.628.8039 or visit http://www.smgov.net/kbug.

Previous Article

Political Posters Invade Arena 1 Gallery For Santa Monica Art Walk On March 16: Arena 1 Gallery To Take Part In Santa Monica Art Walk Saturday

Next Article

Samohi Chops Down Mission Hills 51-33: Vikings Outthink Grizzlies To Advance In CIF Basketball State Playoffs

You might be interested in …

Baldwin.

NKLA Adoption Pets Of The Week: Baldwin & Sensei:

The NKLA Pet Adoption Center has adoptable dogs and cats from featured NKLA Coalition partners, including Baldwin and Sensei. Adoption specials daily including waived adoption fees. All pets are spayed or neutered, microchipped, and vaccinated. […]

Heal the Bay's Bring Back the Beach Gala

Heal The Bay Gala Honors LAcarGuy, Incubus:

Local ocean-protection group Heal the Bay welcomed a record number of attendees to its annual “toes-in-the-sand” gala at the Jonathan Club in Santa Monica on May 15. On an appropriately balmy evening, the “Bring Back […]